Holy Shield Containerized Incinerator with Particle Filtration and High Temperature Inactivation

Customization: Available
After-sales Service: Video Technical Support
Warranty: 1 Year

Product Description

i

Basic Information

Model NO.
HLPG-20-30-50-150-300-500
Condition
New
Certification
ISO, CE
Automation
Automatic
Treatment
Pyrolysis
Color
Customized
Raw Material
Carbon Steel
Function
Waste Burning

Product Presentation

Technical Parameters

Device Model HLPG-50 HLPG-100 HLPG-150 HLPG-300 HLPG-500
Incineration capacity (KG) 30-50/batch 50-100/batch 100-150/batch 200-300/batch 300-500/batch
Combustion chamber size(mm) 1800*1150*1200 1900*1200*1260 2000*1200*1360 2200*1570*1510 3000*1750*1710
Volume 0.7m² 0.97m² 1.19m² 1.75m² 3.64m²
Oxygen supplement fan 0.55kw 0.55kw 0.75kw 1.5kw 3kw
Fuel Tank Capacity 60L 60L 60L 200L 200L
Total Weight (kg) 7900 8700 9500 13400 19300

Application Areas & Project Cases

!

Why Choose Us

Professional Expertise: With over 19+ years of expertise in Incinerator products, we have been trusted by 5000+ customers for solid waste treatment solutions.

One-Stop Service: We offer a comprehensive service covering solution design, R&D, manufacturing, installation, and commissioning.

Manufacturing Power: A source factory with 13,000+ m² workshops and 50+ patents. We have exported to 30+ countries with a proven track record.

?

Frequently Asked Questions

What is the minimum order quantity (MOQ)?
Our minimum order quantity is 1 piece.
Do you support customization and OEM services?
Yes, we support customized logos. For OEM/ODM orders, the typical turnaround time from design confirmation to production is 30 days.
What is the product warranty period?
Our products come with a standard one-year warranty.
What is the expected shipping time?
Standard products ship within 30 business days after order and payment confirmation. For larger or customized orders, we will provide a specific timeline in advance.
What are the payment terms?
A 30%-50% down payment is required before production. The remaining 50%-70% balance is due after production is confirmed via pictures/videos and before delivery.
What kind of waste can this incinerator handle?
Our systems are designed for solid waste treatment and waste burning, featuring high-temperature inactivation and particle filtration for efficient disposal.

Related Products